Pipeline Tie-Ins

1.    The unconnected sections of the lowered pipeline sections at various locations have to be welded, coated and back-filled to make the sections ready for post installation hydro test.

2.    If a pup piece cannot be avoided for tie-in, the minimum 1.0 m length shall be added.